So with Penelope's temprature dropping, 98 degrees means I have 12-24 hrs before labor, I rushed home from work to get the whelping box built. I had already bought the supplies but half way through needed to run to Home Depot for more braces for the edges. Turned out really good, in my opinion! Penelope seems to like it. It will be where she spends time with her babies. It had to be big enough for an adult [umm me] to sit inside with her and the puppies. The last thing I need to do is screw dowel rods along the inside. This prevents the chance of a puppy getting trapped underneath Penelope she happens to lean up against the side.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment